An assumption of the PERT method is:
A) Activity times are not constant.
B) There is uncertainty in individual activity time estimates.
C) Distribution of project completion times and the probability that each activity is on the critical path can be computed.
D) All of the above
Correct Answer:
Verified
Q3: A forward pass of the above network
Q4: The advantage(s)that the Gantt chart has over
Q5: The purpose of performing a forward pass
Q6: The advantage(s)of the network method over the
Q7: Given the list of activities,the expected
Q9: Project managers' objectives include:
A)Cost
B)Quality
C)Flexibility
D)All of the above
Q10: Controlling a project does NOT include:
A)Monitoring costs,time,and
Q11: Project management requires:
A)Scheduling,planning,and controlling
B)Quantitative skills
C)Behavioral skills
D)All of
Q12: A network-based project scheduling method that requires
Q13: Multiple critical paths can exist under the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents