Which of these actions would tend to make an MRP system less nervous?
A) using the same component, such as a fastener, at multiple levels throughout the product structure tree
B) making the minimum order quantity as small as possible
C) increasing the number of levels in a product structure tree
D) increasing the minimum order quantities only at the highest level of a bill or materials
Correct Answer:
Verified
Q40: Consider the product structure tree shown below:
Q41: Component J is ordered on February 1,
Q42: MRP nervousness refers to the notion that
Q43: The planning technique that uses the master
Q44: MRP is NOT capable of:
A)lowering inventory levels.
B)helping
Q46: Company B has no inventory at any
Q47: Using this MRP record and a
Q48: With an inventory as shown in
Q49: There is no beginning inventory. What
Q50: If a manufacturer had no inventory of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents