The earliest finish time for an activity is equal to the latest finish time minus the duration of the activity
Correct Answer:
Verified
Q2: If two paths are tied for the
Q3: In an Activity-On-Node project network,the nodes are
Q5: A Gantt chart of a project shows
Q6: Projects involve routine activities that are performed
Q8: The activities with the longest durations in
Q10: Although PERT and CPM were originally developed
Q10: The sum of durations of the longest
Q11: In PERT,the project duration will never exceed
Q12: The length of the critical path is
Q55: In PERT, the path with the fewest