The manager at a sewing factory uses a piece?rate pay system. She has just received an order for 600 dresses from a discount house downtown. She is trying to figure out what her costs are for the project. She has conducted a time study and found the following times for operations:
2 minutes to sew one sleeve
3 minutes to sew body of the dress
3.5 minutes to hem all unfinished edges
1 minute to attach the collar
3 minutes to attach all buttons
The workers must sit idle while they wait for supplies on the conveyor belt for an average of 30 seconds. Their performance rating is equal to one. She pays the workers $6.00 per hour.
a. What is the allowance factor for the operation?
b. What is the labor standard (in minutes) per dress?
c. What is the labor cost per dress?
d. What is the labor cost for the entire order of 600 dresses?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q43: Determine the sample size for the following
Q44: Consider the work sampling information below.
Q45: A yacht manufacturer signed a contract to
Q46: An employee was observed over an
Q47: A fast-food stand has a thriving
Q49: A manufacturer made a commitment to supply
Q50: Determine the sample size for the following
Q51: A manufacturer made a commitment to supply
Q52: A company manufactures tractors and lawnmowers. They
Q53: Locksmith Inc. has an order from a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents