An assembly line with 28 operations is to be balanced.The total amount of time required for all 28 operations is 39 minutes.The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes.The line will operate for 450 minutes per day.
a.Determine the minimum and maximum cycle time.
b.What is the maximum output rate that this assembly line can achieve?
c.What is the output rate if the cycle time is set at 2.2 minutes?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q68: The twelve tasks necessary to assemble a
Q69: An assembly line with 28 activities is
Q70: A small electronics company assembles power supplies
Q71: An assembly line with 28 activities is
Q72: Consider the following assembly line information for
Q74: In your first job you must set
Q75: An assembly line with 28 activities is
Q76: List the many questions that must be
Q77: The Florida Appliance Company is installing an
Q78: The nine tasks necessary to assemble a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents