The Florida Appliance Company Is Installing an Assembly Line to Produce

Question 77

Essay

The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and you, as an operations manager, are responsible for balancing the line.The tasks to be performed are listed, along with their times and immediate predecessors.
The Florida Appliance Company is installing an assembly line to produce vacuum cleaners, and you, as an operations manager, are responsible for balancing the line.The tasks to be performed are listed, along with their times and immediate predecessors.    The company is planning to operate 2 shifts per day, 8 hours per shift.The desired output rate of the line is 480 units per day.  a.Compute the cycle time per unit in minutes. b.Compute the minimum number of workstations required. c.Use the longest-task-time heuristic to balance the assembly line. d.Compute the efficiency of your assembly line. The company is planning to operate 2 shifts per day, 8 hours per shift.The desired output rate of the line is 480 units per day.
a.Compute the cycle time per unit in minutes.
b.Compute the minimum number of workstations required.
c.Use the longest-task-time heuristic to balance the assembly line.
d.Compute the efficiency of your assembly line.

Correct Answer:

verifed

Verified

a.Cycle time: CT = A/R = 960/480 = 2 min...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents