The project team toiled long into the night to develop consequence of failure scores and probability of failure scores as indicated below.What is the overall risk factor for the project?
A) Less than or equal to 0.7
B) Greater than 0.7 but less than or equal to 0.8
C) Greater than 0.8 but less than or equal to 0.9
D) Greater than 0.9
Correct Answer:
Verified
Q42: What are any four common categories of
Q44: The overall consequence of failure was 0.4
Q47: The consequences of failure categories of cost,schedule,reliability,and
Q49: The overall project risk factor is
Q50: The overall risk factor for the
Q50: If the risk of a negative outcome
Q53: The pointy-haired dean gently suggested that study
Q56: With a cost factor of 0.8,a schedule
Q58: What are the basic qualitative methods for
Q60: Garman yawned as he sat at his
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents