The overall project risk factor is known to be 0.6.The probability of dependency failure is twice the probability of complexity failure and four times the probability of maturity failure.The consequence of performance failure is twice the consequence of reliability failure,four times the consequence of schedule failure and eight times the consequence of cost failure.What is the probability of maturity failure?
A) 0.213
B) 0.197
C) 0.104
D) 0.148
Correct Answer:
Verified
Q44: The probability that the investments made to
Q44: The overall consequence of failure was 0.4
Q45: The overall project risk factor is
Q46: Technical risk is the probability that the
Q49: Sketch a 2 × 2 risk management
Q50: The overall risk factor for the
Q50: If the risk of a negative outcome
Q53: The project team toiled long into
Q56: With a cost factor of 0.8,a schedule
Q58: What are the basic qualitative methods for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents