With a cost factor of 0.8,a schedule rating of 0.6,a reliability rating of 0.5,and a performance rating of 0.6,the overall consequence of failure was:
A) 0.565 for the squidproofing project.
B) 0.500 for the squidproofing project.
C) 0.750 for the squidproofing project.
D) 0.625 for the squidproofing project.
Correct Answer:
Verified
Q51: The programming division at ABC decides to
Q52: The overall project risk factor is
Q53: The pointy-haired dean gently suggested that study
Q54: The professor wore both a belt and
Q55: The overall risk factor for the
Q57: The overall project risk factor is
Q58: What are the basic qualitative methods for
Q59: When new projects involve unproven technology,they are
Q60: Garman yawned as he sat at his
Q61: The task contingency reserves address higher-level risks.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents