The overall project risk factor is known to be 0.5.The probability of dependency failure is twice the probability of complexity failure and four times the probability of maturity failure.The consequence of performance failure is twice the consequence of reliability failure,four times the consequence of schedule failure and eight times the consequence of cost failure.What is the difference between the probability of maturity failure and the consequence of cost failure?
A) 0.026
B) 0.033
C) 0.041
D) 0.048
Correct Answer:
Verified
Q47: The consequences of failure categories of cost,schedule,reliability,and
Q48: The PostHoc Company specializes in justifying decisions
Q49: Sketch a 2 × 2 risk management
Q50: If the risk of a negative outcome
Q51: The programming division at ABC decides to
Q53: The pointy-haired dean gently suggested that study
Q54: The professor wore both a belt and
Q55: The overall risk factor for the
Q56: With a cost factor of 0.8,a schedule
Q57: The overall project risk factor is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents