The overall risk factor for the project is known to be 0.5.The individual failure probability and consequence scores are not known with certainty,only that all of the failure probability scores are identical and all of the consequence scores are identical.What are the individual failure probability scores?
A) 0.316
B) 0.267
C) 0.236
D) 0.347
Correct Answer:
Verified
Q50: If the risk of a negative outcome
Q51: The programming division at ABC decides to
Q52: The overall project risk factor is
Q53: The pointy-haired dean gently suggested that study
Q54: The professor wore both a belt and
Q56: With a cost factor of 0.8,a schedule
Q57: The overall project risk factor is
Q58: What are the basic qualitative methods for
Q59: When new projects involve unproven technology,they are
Q60: Garman yawned as he sat at his
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents