It takes time to ___________ of the workforce and _____________ relationships with suppliers.
A) change habits / improve
B) change attitudes / nurture long-term
C) improve the attitudes / build
D) change old habits / nurture long-term
E) change attitudes / maintain short-term
Correct Answer:
Verified
Q54: The _ JIT production system has been
Q55: The JIT production system is not a
Q56: .The just-in-time (JIT) system is no longer
Q57: There is a list of reasons why
Q58: The following practices are considered essential for
Q60: The Toyota manufacturing system has been viewed
Q61: In a _, removing an end item
Q62: There are two main types of kanban:
Q63: The kanban card contains the part number,
Q64: Kanban is the Japanese word for _.
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents