In a ____________, removing an end item (or a fixed lot of end items) triggers the order release, by which the flow of materials or components is initiated. In contrast, ____________ allow for the production or material flow in anticipation of future demand
A) push system / pull systems
B) pull system / push systems
C) CIT system / CAM systems
D) diverse system / traditional systems
E) traditional system / push systems
Correct Answer:
Verified
Q54: The _ JIT production system has been
Q55: The JIT production system is not a
Q56: .The just-in-time (JIT) system is no longer
Q57: There is a list of reasons why
Q58: The following practices are considered essential for
Q59: It takes time to _ of the
Q60: The Toyota manufacturing system has been viewed
Q62: There are two main types of kanban:
Q63: The kanban card contains the part number,
Q64: Kanban is the Japanese word for _.
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents