There are two main types of kanban: 1. __________ signals the need to produce more parts. Each kanban is physically attached to a container.2. __________ signals the need to withdraw parts from one work center and deliver them to the next work center.
A) Reorder kanban / Production kanban
B) Withdrawal kanban / Production kanban
C) Quality circle kanban / Withdrawal kanban
D) Production kanban / Withdrawal kanban
E) Production kanban / Zero defects kanban
Correct Answer:
Verified
Q54: The _ JIT production system has been
Q55: The JIT production system is not a
Q56: .The just-in-time (JIT) system is no longer
Q57: There is a list of reasons why
Q58: The following practices are considered essential for
Q59: It takes time to _ of the
Q60: The Toyota manufacturing system has been viewed
Q61: In a _, removing an end item
Q63: The kanban card contains the part number,
Q64: Kanban is the Japanese word for _.
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents