Question 41
True/False
A value stream map shows the flows of materials and information and the lines of responsibility and authority.
Question 42
True/False
The theory of constraints accepts existing system bottlenecks and works to maximize throughput given these constraints,while value stream mapping endeavors to understand how existing processes can be altered to eliminate bottlenecks and other wasteful activities.
Question 43
True/False
While lean systems work very well for manufacturing systems,they cannot be applied to service systems.
Question 44
True/False
A one-person cell in which a worker operates several different machines simultaneously to achieve a line flow is called a one-worker,multiple-machines (OWMM)cell.
Question 45
True/False
One benefit of a lean system is that it reduces space requirements.
Question 46
True/False
Use of value stream mapping requires construction of a current state drawing,a future state drawing,and an implementation plan.
Question 47
True/False
Group technology collects similar parts into families and organizes machine tools into separate cells.
Question 48
True/False
A Kanban is a card used to control the flow of production in many just-in-time systems.
Question 49
True/False
The value stream mapping tool often requires completion of the future state drawing before the current state drawing,to help managers see the future state goals and more easily identify problems with the current state of the process.