Activities in a network diagram are drawn in a ____ relationship because, from a technical standpoint, they must be performed in that sequence.
A) parallel
B) vector
C) serial
D) interlocking
Correct Answer:
Verified
Q34: The resource requirements plan illustrates
A) the utilization
Q35: Resource constraints are represented in the network
Q36: Resource requirements graphs based on an as-soon-as-possible
Q37: Technical constraints for a project are represented
Q38: Resource utilization charts based on each activity's
Q40: Which of the following is likely not
Q41: If three activities are using the same
Q42: When performing resource-limited scheduling, those activities with
Q43: If three workers are assigned to a
Q44: If not enough resources are available for