Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Business
Study Set
Operations Management Sustainability Study Set 3
Quiz 10: Human Resources, Job Design, and Work Measurement
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 41
Multiple Choice
Four of the components of job design are
Question 42
True/False
Most unions do not accept the use of predetermined time standards.
Question 43
True/False
An advantage of work sampling is that it completely breaks down work elements.
Question 44
Multiple Choice
The objective of a human resource strategy is to
Question 45
Multiple Choice
Most pit crew members have background experience in what area?
Question 46
True/False
Work sampling and time studies are similar in that the analyst in both cases records the time taken by the worker to accomplish each step of the task.
Question 47
Multiple Choice
Working 4 shifts of ten hours instead of 5 shifts at 8 hours each is known as
Question 48
Multiple Choice
The behavioral approach to job design that involves giving the worker a larger portion of the total task is
Question 49
Multiple Choice
A NASCAR pit crew consists of how many members?
Question 50
Multiple Choice
Job rotation is an example of
Question 51
True/False
A Therblig is a very small amount of time, one hundred-thousandth of an hour.
Question 52
Multiple Choice
The two most basic policies associated with employment stability are
Question 53
True/False
A modern "stopwatch" study can be conducted using a special-purpose PDA, one which can digitally capture events, times, and other variables for later analysis on a spreadsheet.
Question 54
Multiple Choice
When a worker has a say in the work methods that he/she wishes to utilize, his/her job is characterized by
Question 55
Multiple Choice
A manufacturing plant allows its engineers to come in at 7 A.M. plus or minus an hour but still requires them to work 8 hour days. Which of the following scheduling techniques is the firm employing?