At what point should capacity requirements of a proposed system be first considered?
A) Leave it until the system is implemented and see if the system works O.K.
B) As early as possible
C) When the Development Manager has completed testing and passes the system to Operations for operational testing
D) Just before the system goes live
Correct Answer:
Verified
Q3: In Availability Management, Confidentiality and Integrity are
Q4: Typically, the decision on what should be
Q5: An overhead would normally be regarded as
Q6: Which of the following is NOT a
Q7: Why is there sometimes conflict between the
Q9: Which one of the following is NOT
Q10: Which of the following is least likely
Q11: The Requirements and Strategy phase of the
Q12: The CMDB:
A) Must be available for update
Q13: Which of these statements reflect the activities
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents