The table provides a project with the task lengths (in days) and precedence requirements, as well as the three time estimates.
The table provides a project with the task lengths (in days)  and precedence requirements, as well as the three time estimates.    -What should be the desired completion days, if one needed a 99% confidence level? A) 27.39 B) 27.24 C) 27.16 D) 25.93 E) 26.96
-What should be the desired completion days, if one needed a 99% confidence level?


A) 27.39
B) 27.24
C) 27.16
D) 25.93
E) 26.96