If a project manager is using a similar,past project as a basis to estimate costs for a new project,he or she is utilizing analogous estimating.
Correct Answer:
Verified
Q27: A project manager is estimating costs on
Q28: Rank the four different types of cost
Q29: Effective comparative estimates rely most heavily on:
A)An
Q30: An order of magnitude estimate is usually
Q31: Which of these estimates should be the
Q33: Cost estimates that are based as a
Q34: Once most of the design work is
Q35: When their baby was ready to head
Q36: Analogous estimation is a type of _
Q37: The analogous estimation method is a bottom-up