When their baby was ready to head off to college,the beleaguered parents pulled out the college folder from their file cabinet and added up the cost of putting their first child through college from 1995-2000.The mother whimpered as she factored in the rising cost of tuition,fees,books,and inflation by multiplying the total by 2.5.The father felt a searing pain go through his chest as he saw the total,knowing full well that their cost estimation approach,called:
A) An order of magnitude estimate,was highly accurate.
B) Parametric estimation,was highly accurate.
C) Feasibility estimation,was highly accurate.
D) Definitive estimation,was highly accurate.
Correct Answer:
Verified
Q30: An order of magnitude estimate is usually
Q31: Which of these estimates should be the
Q32: If a project manager is using a
Q33: Cost estimates that are based as a
Q34: Once most of the design work is
Q36: Analogous estimation is a type of _
Q37: The analogous estimation method is a bottom-up
Q38: An activity with a learning rate of
Q39: If it takes 40 hours to complete
Q40: A key for developing project cost estimates
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents