Cost estimates that are based as a guideline on real numbers,or figures derived after the completion of preliminary design work,are:
A) Definitive estimates.
B) Order of magnitude estimates.
C) Parametric estimates.
D) Feasibility estimates.
Correct Answer:
Verified
Q28: Rank the four different types of cost
Q29: Effective comparative estimates rely most heavily on:
A)An
Q30: An order of magnitude estimate is usually
Q31: Which of these estimates should be the
Q32: If a project manager is using a
Q34: Once most of the design work is
Q35: When their baby was ready to head
Q36: Analogous estimation is a type of _
Q37: The analogous estimation method is a bottom-up
Q38: An activity with a learning rate of