Solved

Champion Cooling Company Uses a Kanban System at Their Two

Question 132

Essay
Champion Cooling Company uses a kanban system at their two locations in the Oklahoma City Metroplex. The daily demand for fans is 2,000 at each location and management insists on using the same alpha level (0.1) at both locations. Location Reno uses containers that hold 20 items and takes 0.04 of a day to process a container. It takes 0.07 of a day to get a container filled and for it to wait during its cycle. Location Western uses containers that hold 24 items and takes 0.02 of a day to process a container. It takes 0.08 of a day to get a container filled and for it to wait during its cycle. Which location has the higher level of inventory? Assume that both locations round up to the next highest integer number of containers.

Champion Cooling Company uses a kanban system at their two locations in the Oklahoma City Metroplex. The daily demand for fans is 2,000 at each location and management insists on using the same alpha level (0.1) at both locations. Location Reno uses containers that hold 20 items and takes 0.04 of a day to process a container. It takes 0.07 of a day to get a container filled and for it to wait during its cycle. Location Western uses containers that hold 24 items and takes 0.02 of a day to process a container. It takes 0.08 of a day to get a container filled and for it to wait during its cycle. Which location has the higher level of inventory? Assume that both locations round up to the next highest integer number of containers.

Correct Answer:

verifed

Verified

kReno = blured image = blured image = 12.1 → 12
WIPRen...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents