A simple CPM network has three activities,A,B,and C.A is an immediate predecessor of B and of C.B is an immediate predecessor of C.The activity durations are A=4,B=3,C=8.
A) The critical path is A-B-C,duration 15.
B) The critical path is A-C,duration 12.
C) The critical path is A-B-C,duration 13.5
D) The critical path cannot be determined without knowing PERT expected activity times.
E) The network has no critical path.
Correct Answer:
Verified
Q45: Activity R on a CPM network has
Q46: Every network has at least one critical
Q46: The network analysis method that allows activity
Q47: Which of the following statements regarding CPM
Q51: Which of the following statements regarding critical
Q53: Activity D on a CPM network has
Q54: The critical path can be determined by
Q58: What is the basic difference between PERT
Q59: The ES of an activity that has
Q79: Which of the following statements concerning CPM
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents